SINGLE STOREY OVERHEAD PLATFORM

Usually erection of scaffolds will be handled by contractor, but it will be an advantage for us to understand the correct methods of erecting scaffolding. Improper erection may result to a serious injury to the workers and damage to the equipment.  A single storey (stage) overhead platform (STIP) is commonly erected with reason for the worker to work on such equipment at height beyond ground reach of between 6 feet to 12
feet. This platform is needed for us to do work or maintenance comfortably.(i.e. Like overhead valves, high switches beside vessels, high pipeline flanges ).

If the equipment is higher then 12 feet, (which is more then twice to the average human height), a multi stage scaffolds need to be raise.


1. Ensure spaces between platform transoms does not exceed the following:
a. 990mm (3 feet) space for 32mm (1.3 inch) board (plank) thickness.
b. 1520mm (5 feet) for 38mm (1.5 inch) board thickness.
c. 2600mm (8.5 feet) for 50mm (2 inch) board thickness.
2. Ensure the gaps between board (planks) do not exceed 25 mm (1 inch).
3. Install Toe board above the planks, basically to prevent tools or materials place on the
planks form dropping to ground.
4. Only select good scaffolding tubes for the structure frame work, discard dented tube.
5. Use swivel or double coupler on the right place.
6. Use Base plate (planks) , to prevent scaffolds footers from sinking or tilting.
7. Diagonal or Transverse or Longitudinal brace are used to strengthen the structure
frame of the scaffolds. Transverse brace is fitted on every lift needed (about 6 feet
ht.)
8. Install ladder to easy access to the platform floor, ladder must be properly secured
vertically along the scaffolds structure and extend at least 1M (3 feet) above the
working platform.
9. Ensure that Guardrail are fitted at height of between 920mm to 1150mm ( 3 to 4 feet).
To protect worker from falling and for the workers to hook their safety harness.

 

  

Web

 

  

  

Sponsored Links

 

 

Mobile Crane Inspection Guidelines for OSHA Compliance Officers
Although some crane inspection checklist items are self-explanatory, Observing crane operations prior to an inspection, or asking questions about how it Crane Inspection Services. - Crane Operator Training, Crane Crane Inspection Services provides accredited crane operator training, crane inspection, load testing, overhead rigging training, crane accident ...
www.craneinspection.com

Crane Management - Home
Port of Miami Crane Management, Inc., (Crane Management) a company created ... Crane Management recorded 1.01% overall downtime in fiscal Crane Management :: Home
[Crane Management description]  Crane Aboriginal Management Services (CAMS) is a 100% Native owned company with experience in business plan preparation Sparrows Offshore - Offshore Crane Management, Operation The world's largest offshore crane management, lifting and mechanical handling contractor, encompassing engineering, design, manufacture, operation, ...
www.sparrowsoffshore.com

CMS2000™ Crane Management System - Product Information
CMS2000™ Crane Management System. Status displays. Production logging. Fault logging. System Diagnostics. Maintenance Management. Remote Diagnostics Crane Management Awareness bullet. Crane Management Workbook. bullet. Crane Safety Reference Card. bullet. Rigging Safety Reference Card. bullet. Hoisting Personel Safety Reference ...
www.craneinstitute.com

Riggers Page
Ratings charts and usage information for a variety of theatrical rigging hardware. www.rigging.net/ -
Aerial Delivery - Army Quartermaster Parachute Riggers Airborne Aerial Delivery & Army Rigger History Page. Career: Riggers The Internet System for Education and Employment Knowledge (ISEEK) is Minnesota's website for career exploration, education and training, employment and
Brion Toss Yacht Riggers, Sailboat Rigging This website is an outgrowth of both rigging and teaching; in the following pages you'll find field-proven tools and ideas powerful and elegant enough
www.briontoss.com

Riggers Manufacturing Company
RIGGERS MANUFACTURING COMPANY produces top-of-the-line equipment for lifting and transporting heavy loads in confined and exacting situations. Summary Report
49-9096.00 - Riggers. Set up or repair rigging for construction projects, manufacturing plants, logging yards, ships and shipyards, or for the entertainment Amazon.com: Technical Rescue Riggers Guide: Books: Rick Lipke Amazon.com: Technical Rescue Riggers Guide: Books: Rick Lipke by Rick Lipke.
www.amazon.com

Riggers
49-9096 Riggers. Set up or repair rigging for construction projects, manufacturing plants, logging yards, ships and shipyards, or for the entertainment Rigging certificates Anyone intending to undertake field work using riggers should purchase a copy of the Safety Information Handbook outlining the requirements for safety ETCP - The Entertainment Technician Certification Program
ETCP is proud to announce the first ETCP Certified Riggers! Congratulations to the riggers who have made this important professional commitment to ...
etcp.esta.org/cert

 

 

  

Find What You Are Looking For?

 

    Can't find the one you're looking for?
Search our database of over 1, 000, 000 Information

Quick Search

Assist us in keeping this site ONLINE by adding to your Bookmarks!! Thank you for your support


©2007-2020 Intro2U.COM.  All rights reserved. Intro2U.COM and its Contents are registered trademarks of Intro2U.COM
The Introduction Search Engine, The Introduction Web, The Introduction Toolbar and Design Info are service marks of Intro2U.COM
No portion of this site may be copied, retransmitted, reposted, duplicated or otherwise used
without the express written permission of Intro2U.COM